  • Review & approve sch. design including:

  1.  Main building structure system & material

  2. Building envelope (exterior wall assembly)

  3. Roof type assembly and finishes

  • Payment of development & permit fees to AHJ

  • Discuss fixtures & finishes

  • Approve fixtures & finishes

Residential
Building Code Part 9 & 11

 

CONTRACT ADMINISTRATION

  • Attend site meetings with architect, consultants, and contractors

STEPS TO GET A BUILDING PERMIT

Non-Residential
Building Code Part 3 & 11

 

 

ARCHITECT

 

  • Space program

  • Zoning by-law review

  • Existing site condition

  • Existing bldg measurment

  • Floor plans

  • Main elevations

  • 3D massing

  • Consultation as needed

 

CONCEPT DESIGN

 

SCHEMATIC DESIGN

CLIENT

  • Provide list of spaces

  • Provide overal imagery

  • Review, comment & approve program

  • Outline Spec

  • Detailed floor plans

  • Annotated main elev.

  • Doors & Windows schedules

  • Room finish schedules

  • 3D perspective & Isometric

  • Consultant coordination

 

DESIGN DEVELOPMENT

 

CONSTRUCTION DOCUMENTS

  • Project Manual (Spec)

  • Material Board

  • Fixtures & finishes selection

  • Main wall sections

  • Project specific construction details

  • Elevation schedules

  • Review & respond to bidders inquiries

  • Consultant coordination

  • Site observation & report

  • Review shop drawings

  • Final visit & deficiency list

  • General review

  • Clearance letter

 

CONTRACT ADMINISTRATION

Building Permit

STEPS TO GET A BUILDING PERMIT

Non-Residential
Building Code Part 3 & 11

 

 

ARCHITECT

 

CLIENT

 

CONSTRUCTION DOCUMENTS

 

DESIGN DEVELOPMENT

 

SCHEMATIC DESIGN

 

CONCEPT DESIGN

  • Project Manual (Spec)

  • Material Board

  • Fixtures & finishes selection

  • Main wall sections

  • Project specific construction details

  • Elevation schedules

  • Review & respond to bidders inquiries

  • Consultant coordination

 

CONTRACT ADMINISTRATION

  • Site observation & report

  • Review shop drawings

  • Final visit & deficiency list

  • General review

  • Clearance letter

  • Outline Spec

  • Detailed floor plans

  • Annotated main elev.

  • Doors & Windows schedules

  • Room finish schedules

  • 3D perspective & Isometric

  • Consultant coordination

  • Floor plans

  • Main elevations

  • 3D massing

  • Consultation as needed

  • Space program

  • Zoning by-law review

  • Existing site condition

  • Existing bldg measurment

  • Provide list of spaces

  • Provide overal imagery

  • Review, comment & approve program

  • Review & approve schematic design including: Main building structure system & material - Building envelope (exterior wall assembly) Roof type assembly and finishes

  • Payment of development & permit fees to AHJ

  • Discuss fixtures & finishes

  • Approve fixtures & finishes

Residential
Building Code Part 9 & 11

Building Permit

  • Attend site meetings with architect, consultants, and contractors

CONTACT US

Thanks for submitting!

SUBSCRIBE

Thanks for submitting!

CALL US

+1 (647) 222-0206

Ontario, Canada

FOLLOW US

  • Instagram
  • Facebook
  • Pinterest

© 2020 by ASM Architect Inc.

bottom of page